WHEN THE ULX IS INSTALLED BY TRENCHING, THE ULX SHALL BE FILLED TO CAPPING LAYER WITH AN APPROVED FILL. FILL IS TO BE COMPACTED TO 5 SPECIFICATIONS. BALLAST IS THEN TO BE RESTORED TO THE CORRECT PROFILE AND ANY VOIDS UNDER SLEEPERS FILLED & TAMPED. OUTSIDE THE TRACK FORMATION THE FIRST 5 mm OF FILL ABOVE THE PIPES SHALL BE STABILISED SAND.
Construction of under line (ULX) and under road (URX) crossings. Construction of cable pits, jointing pits and cable turning chambers. Installation of all main and local signalling, communications and power cables. Removal of redundant material, equipment and surplus spoil.
• cable pits, jointing pits and cable turning chambers • foundations for signals, gantries, location cases, ground frames • bootleg risers and mounting posts for trackside track circuit equipment
EP 20 00 04 05 SP Cable Pits . EP 20 00 04 06 SP Underground Cable - Location Recording . SPC 207 Track Monitoring Requirements for Undertrack Excavation . ... ULX (all) > AS 4799 / 1600 mm (min)* below rail > Monitoring (SPC 207)* ULX (non rail) > 4 m recommended to: -FSL -to drainage inverts -planned corridor FSL ...
Combined Services Route (CSR) - GHD - 12d
There were several hundred pits of various sizes for cable pulling and changes in directions. There were trenches that went across and under the railway (called ULX) and also cables above the ground placed inside galvanised service troughs (GSTs).
hundred pits of various sizes for cable pulling and changes in directions. There were trenches that went across and under the railway (called ULX) and also cables above the ground placed inside galvanised service troughs (GSTs). in CAD. Initially the link of the templates was The Challenge The CSR designed very often clashed with
ULX Installation, Global Network Solutions
Installation of service pits and cabling trenches; Provision of plant, labour and supervision; Works were completed ahead of schedule, as a result, additional service pits were installed in remaining time. Works were completed to strict technical specifications.
Service - Ikon Civil
We have a large array of rail certified cable hauling equipment to undertake any sized project, as well as certified and full compliant staff list with years of installation experience. Ikon Civil offer a range of services within the rail industry.
Specialised Track & Civil Construction - Apex Rail
We take pride in our modern, rail compliant fleet - operated by qualified and competent operators and fully equipped with rail attachments and the latest GPS technology. Apex Rail is a trusted partner in delivering track and civil construction services …
1. ULX installation and track monitoring - full track block UP & DN Botany 16.200. 2. ULX pit works in triangle and 10- ft. 3. Segregation fence install in 10- ft. 4. Illawarra Road bridge anti-throw screen install. 5. CSR & LCR install in 10 -ft. 6. Trenching and civil works on Platform 0. 7. Radio mast pile and pile cap in 10- ft. LINEWIDE ...