
Optimum ramp design in open pit mines - ResearchGate
Jun 25, 2019 · The problem studied in this paper is that of designing the optimal open pit haulage ramp that, for a given ramp width and a maximum ramp gradient, connects two points of the mine, minimising...
Optimum ramp design in open pit mines - ScienceDirect
Mar 1, 2020 · The problem studied in this paper is that of designing the optimal open pit haulage ramp that, for a given ramp width and a maximum ramp gradient, connects two points of the mine, minimising construction and operational costs.
To use a ramp, the mine design must comprehen-sively take into account the mining technical con-ditions, production scale, the surroundings, and other various factors. The ramp arrangement must be optimized after detailed technical and eco-nomic comparison of the options.
Ramp, Types and Structure of - SpringerLink
Nov 26, 2022 · To use a ramp, the mine design must comprehensively take into account the mining technical conditions, production scale, the surroundings, and other various factors. The ramp arrangement must be optimized after detailed …
timal open pit haulage ramp, for a given ramp width and a max- imum ramp gradient, which connects two points of the pit, min- imising construction and operational costs.
Schematic drawing of a typical mine ramp-based underground …
In this research, we made use of traffic signal lights, Radio Frequency (RF) Transmitters (Tx) and Receivers (Rx) and a traffic signal lights module to safeguard LV motion on underground ramp....
Ramps are one of the most important aspects of mine planning. Their presence should be included early in the mine planning process since they have a significant effect on the reserves (Hustrulid et al., 2013a).
A methodology for automatic ramp design in open pit mines
ABSTRACT: The design of ramps in open pit mining is a complex problem that, even though it has a great impact in the value of a project, does not rely on optimization tools as other problems like the computation of nested pits or direct block scheduling.
In this paper, we present a methodology to assist the ramp design in underground mining, minimizing both development and operational costs. The methodology considers an optimization model that obtains an initial ramp design, which is subsequently, refined to arrive at …
Methodology to Optimize and Sequence the Semiautomated Ramp …
Feb 22, 2019 · In this paper, we present a methodology to assist the ramp design in underground mining, minimizing both development and operational costs. The methodology considers an optimization model that obtains an initial ramp design, which is subsequently, refined to arrive at the final configuration.