This article contains affiliate links. We may earn a small commission on items purchased through this article, but that does not affect our editorial judgement. Rail passengers have been thanked ...
Hosted on MSN20d
More rail disruption this weekend as major week-long line closures for key engineering works endsThis included: At Portcreek Junction, where engineers laid 390m of new track and 450m of electric rail and replaced two sets of points At Landport Viaduct, which supports the trains at Portsmouth ...
At Portcreek Junction, engineers installed 390 meters of new track and 450 meters of electric rail, which provides power to trains. Additionally, two sets of points were replaced—these are moveable ...
Network Rail’s engineers worked during the day and the night at several sites. At Portcreek Junction, engineering workers laid 390m of new track and 450m of electric rail. They also replaced two sets ...
Network Rail engineers worked around the clock across a number of different worksites, including: Portcreek Junction, where engineers laid 390m of new track and 450m of electric rail (the part of the ...
Train services in south west London and in the Southampton, Portsmouth, and Bournemouth areas will be disrupted over Easter.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results