News

The Uttan-Virar Sea Link Phase 1 will stretch for 55.12 km and include the Uttan-Virar sea link and the three approach roads ...
The Virar-Alibaug Corridor is seen as a strategic solution to decongest Mumbai and boost economic growth in surrounding areas. However, its future now hinges on the viability of the BOT model and the ...
The Virar–Alibaug Multi-Modal Corridor is a long-planned infrastructure project under consideration since 2011 ...
A slum colony comprising over 80 unauthorised shanties in Borivli East on Western Railway (WR) was razed on April 29, paving ...
A seven-month-old boy tragically fell to his death from the 21st floor of a high-rise in Virar after reportedly slipping from ...
After tenders for the RAS 66,000 crore Virar-Alibag Corridor came 36 per ent costlier, MSRDC scrapped them and proposed ...
Mumbai: A 7-month-old baby died after falling from the 21st floor on Wednesday in Virar west. The Bolinj cops have registered ...
Maharashtra's Deputy CM Devendra Fadnavis anticipates the Mumbai-Ahmedabad bullet train's completion by 2028, highlighting ...
MMRDA Chairman Eknath Shinde said that the project is a “shining example of the government’s commitment to balanced regional ...
A slum colony comprising over 80 unauthorised shanties in Borivli East on Western Railway (WR) was razed on April 29, paving ...