The world's busiest country is currently building a revolutionary road that will slash travel times and reduce traffic ...
The work on the final phase of the highly anticipated Airoli-Katai Naka project is expected to commence soon. As per a report by Times of India, the Mumbai Metropolitan Region Development ...
Construction of a 13.4 km long elevated road along Mumbai’s Eastern Express Highway (EEH), stretching from Chheda Nagar in ...
Work on the Airoli-Katai Naka Road project—which will bring relief to motorists travelling from Airoli towards Kalyan, Dombivli, Ambernath and Badlapur—is progressing at a fast pace ...
Naik, an MLA from Airoli, asked officials to prepare a report on the project with details like the expected area of the park and estimated cost. “There is great scope for tourism development ...
Work has begun on a 13.4-km elevated road from Chheda Nagar to Mulund East along the Eastern Express Highway. Costing Rs ...
Entry and exit points for the elevated road have been planned at key locations, including Chheda Nagar, Kanjurmarg, Airoli ...
Airoli assembly constituency stands as one of Maharashtra's 288 legislative assembly seats. This General category constituency is located in Thane district and represents one of the 6 assembly ...
Phase I also includes twin tunnels with four lanes Sections of the 12.30-km Airoli-Katai Naka Road, which includes 1.68-km twin tunnels that run below Parsik hill. Pics/Sayyed Sameer Abedi Phase I ...